Nashaat Nassar describes his LNG technology research in his lab at the University of Calgary in Calgary, Friday, Sept. 20, 2019. THE CANADIAN PRESS/Jeff McIntosh

New LNG tech developed at University of Calgary touted as greener, cheaper

Less equipment, energy, water and chemicals means lower operating costs and emissions

University of Calgary researchers focused on nanotechnology say they have developed a cheaper and more environmentally friendly way to create liquefied natural gas.

The Split Flow Integrated LNG process uses specialized materials and chemistry to remove carbon dioxide and other impurities from the natural gas stream without having to cool and then warm the gas, as is done now in the leading LNG process, say its developers, associate professor Nassar Nashaat and student Arash Ostovar of the Schulich School of Engineering.

The result is that capital costs are reduced because less equipment is needed, while operating costs and greenhouse gas emissions are lowered because less energy, water and chemicals are consumed.

The duo are seeking an industrial partner to use the technology on a pilot basis to prove its benefits.

“We have plenty of natural gas resources here in Alberta and existing facilities where our technology can be integrated,” said Nassar, estimating there are 50 potential locations.

“The idea is that anybody who is producing natural gas can now produce LNG.”

Proponents tout LNG as a transition fuel which can replace coal or diesel as a more environmentally friendly way to generate electricity and power vehicles. Natural gas volumes are reduced by about 600 times when converted to LNG.

But environmentalists have charged that building B.C.’s many proposed LNG projects — including the $40-billion LNG Canada project led by Shell Canada which is now under construction — will make it impossible for the province to meet its GHG emission reduction targets.

RELATED: ‘What’s in it for Terrace?’ City braces for impacts of LNG development

Travis Balaski, vice-president of Calgary-based Ferus Natural Gas Fuels, said he was impressed after seeing a presentation on the new LNG technology but is concerned about its actual operating costs.

“This technology is obviously quite attractive to a company like us but it’s got to be proven before we would ever be in a position to deploy it,” he said.

Ferus is planning a $40-million expansion to triple the output from its LNG plant near Grande Prairie in northern Alberta.

The developers are hoping to find a partner to build a project that produces about 500,000 pounds of LNG per year, enough to power a 250-megawatt electrical generation plant.

The LNG Canada project is designed with capacity for 14 million pounds of LNG per year.

Dan Healing, The Canadian Press

Like us on Facebook and follow us on Twitter

Just Posted

Fraser Canyon Hospital has urgent need for stretchers

Stretchers needed in Hope’s emergency room cost $12,000 each

Lighting up Hope for a cause

Purple light displays shine a light on domestic violence

‘Family and Friends in Memory of Linda’ raise $7,700

Linda McNicol, a long-time employee at the CIBC branch in Hope, passed away in June

Contentious issues debated at candidates meeting in Hope

Locals pack conference hall to learn more about local candidates

Drivers warn of slippery conditions on the Coquihalla

Snow is falling at the Summit of the Coquihalla

B.C. mayor apologizes for removal of Queen’s portrait from council chambers

‘I prefer to be inclusive of the many aspects of our history’

Alcohol a possible factor in crash that killed 17-year-old girl near Williams Lake

A pickup truck left the road and rolled over on Highway 20 on the weekend

Rare bird spotted in Victoria draws enthusiasts from across the continent

It’s the first time a yellow-browed warbler has been reported on the mainland of North America

B.C. woman must pay $1,000 after unleashed dog bites another

Owner should never have left Bibi unattended, tribunal member wrote

80% of TransLink bus routes are slower today than five years ago: report

TransLink says delays are costing $75 million a year

Climate activist Greta Thunberg’s mural defaced in Edmonton

The eyes on the portrait were blacked out

VIDEO: Depth and scoring lacking for Vancouver Giants this season: Coach

G-Men defeated on home ice Sunday by Victoria – next up Everett on Friday

Report suggests new BC Ferries terminal near YVR

Metro Vancouver currently has two ferry terminals at northern and southern reaches

Most Read