Four new storage tanks have been constructed at Trans Mountain’s Edmonton terminal to prepare for opening of the oil pipeline expansion from Alberta to Westridge Terminal in Burnaby B.C. (Trans Mountain)

Four new storage tanks have been constructed at Trans Mountain’s Edmonton terminal to prepare for opening of the oil pipeline expansion from Alberta to Westridge Terminal in Burnaby B.C. (Trans Mountain)

Trans Mountain begins laying Alberta pipeline for expansion

Construction continues at Westridge terminal in Burnaby B.C.

Trans Mountain Corp. has begun laying pipe across the Alberta segment of its oil pipeline twinning project, expecting to have the first pipe welded, tested and buried by Christmas.

Construction so far has included completion of four new storage tanks at the federal government-owned company’s Edmonton Terminal, and continued work on the Westridge Terminal facilities at Burnaby to accommodate additional tankers for exporting crude.

Pipe is being assembled on the Greater Edmonton section, with clearing, grading, utility relocation and worksite preparations for a series of tunnel-bored sections. Horizontal drilling is planned for 13 sections on the Alberta side of the project, to cross watercourses, railways, major roads, sensitive environmental areas and urban areas, Trans Mountain said in its latest project update.

Trenchless construction is also expected to play a large role in the B.C. section of the project, where thousands of property owners have moved in along the right-of-way since the original Trans Mountain was built in 1954.

Trenchless construction is also expected to play a large role in the B.C. section of the project, where thousands of property owners have moved in along the right-of-way since the original Trans Mountain was built in 1954 to supply refineries at Burnaby and Washington state as well as tanker exports from Burnaby.

RELATED: CEO promises ‘the best darn pipeline in the world’

RELATED: Indigenous leaders choose pipelines over poverty

RELATED: Oil-by-rail traffic rises as B.C. battles Trans Mountain

The B.C. government has continued to oppose the Trans Mountain expansion, supported by Washington Gov. Jay Inslee, despite increased crude by rail coming through Alberta and B.C. to Washington since the existing Trans Mountain line became over-subscribed.

In a year-end interview with Black Press, B.C. Premier John Horgan acknowledged that construction is likely to intensify an already acute shortage of skilled construction workers, as work camps and gas pipeline spreads take shape across northern B.C. to supply the LNG Canada project from Dawson Creek to Kitimat.

B.C. is using a union-only construction model to build the Kicking Horse Pass and other sections of the Trans-Canada Highway from Kamloops to the Alberta border, as well as replacing the Pattullo Bridge and building the Broadway subway line in Metro Vancouver. A skilled labour shortage is driving up costs on those projects, Horgan said.

“And at the same time we have private sector projects like LNG Canada, and potentially the Trans Mountain pipeline, that are going to be taking a whole bunch of workers out of play when it comes to public contracts, and that’s a challenge for government,” Horgan said.

From the Greater Edmonton section, the Trans Mountain right of way goes to Edson, Hinton, Spruce Grove, Stony Plain and Wabamun before reaching the Jasper-Mount Robson stretch where twinning was done a decade ago.

Entering B.C. in the North Thompson region, the pipeline route goes by Avola, Barriere, Blue River, Clearwater, Valemount and Vavenby, where the forest industry has been wound down due to market conditions and loss of lumber to beetle infestations and fires.

At West Barriere, another existing expansion section will be tested and activated, running from a pump station north of Barriere to a new Black Pines pump station north of Kamloops. From there the project goes past Kamloops and Merritt, then down the Coquihalla Pass to Hope.

The project proceeds down theFraser Valley through Chilliwack, Abbotsford and Langley, then into the heavily populated Lower Mainland through Langley, Surrey, Coquitlam and Burnaby.


@tomfletcherbc
tfletcher@blackpress.ca

Like us on Facebook and follow us on Twitter.

BC legislatureTrans Mountain pipeline

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

Construction is expected to start in March of 2021 on 23 new rental homes funded by the provincial government’s Community Housing Fund. (Metro Creative photo)
Province announces rental home project in Chilliwack paid for by Community Housing Fund

Twenty three homes for Indigenous families are planned in partnership with Tzeachten First Nation

Canadian Red Cross staff engaged in a Personal Protective Equipment (PPE) and social distancing training exercise. (Luc Alary / Canadian Red Cross)
Red Cross canvassers following PHO guidelines while going door-to-door

Canvassers using safety protocols including masks and distancing to continue organization’s efforts

Chilliwack-Hope MP Mark Strahl, pictured here in 2017, has harsh words about the federal government’s Fall Economic Statement. (Black Press file)
Chilliwack MP Mark Strahl says Liberal government is leaving millions of Canadians behind

Strahl delivered a blistering critique of the federal government’s Fall Economic Statement

Phyllis Stenson, a mainstay of the local arts scene and the Harrison Festival of the Arts, passed away earlier this month. Stenson was crucial in setting up the foundation for relationships, funding and more that continue even now to echo well past her retirement in 2013. (Contributed Photo/Harrison Festival Society)
Harrison Festival, Fraser Valley arts icon Phyllis Stenson mourned

Stenson passed away in late November, leaving lasting legacy of passion for the arts behind

Elkhart Gas Station, located on Highway 97C about 60 kilometres west of Peachland, opened in November 2020. (Google maps)
The Okanagan Connector now has a gas station

The highway previously ran for over 117 kilometres without a place to fuel up

Provincial health officer Dr. Bonnie Henry updates B.C.’s coronavirus situation at the legislature, Nov. 30, 2020. (B.C. government)
Hockey team brought COVID-19 back from Alberta, B.C. doctor says

Dr. Bonnie Henry pleads for out-of-province travel to stop

B.C. Premier John Horgan on a conference call with religious leaders from his B.C. legislature office, Nov. 18, 2020, informing them in-person church services are off until further notice. (B.C. government)
B.C. tourism relief coming soon, Premier John Horgan says

Industry leaders to report on their urgent needs next week

An RCMP cruiser looks on as a military search and rescue helicopter winds down near Bridesville, B.C. Tuesday, Dec. 1. Photo courtesy of RCMP Cpl. Jesse O’Donaghey
B.C. Mountie, suspect airlifted by Canadian Armed Forces from ravine after foot chase

Military aircraft were dispatched from Comox, B.C., say RCMP

Photo by Dale Klippenstein
Suspect tries to thwart police in Abbotsford with false 911 call about men with guns

Man twice sped away from officers and then tried to throw them off his trail

An 18-year old male southern resident killer whale, J34, is stranded near Sechelt in 2016. A postmortem examination suggests he died from trauma consistent with a vessel strike. (Photo supplied by Paul Cottrell, Fisheries and Oceans Canada)
“We can do better” — humans the leading cause of orca deaths: study

B.C. research reveals multitude of human and environmental threats affecting killer whales

A logo for Netflix on a remote control is seen in Portland, Ore.,Aug. 13, 2020. Experts in taxation and media say a plan announced Monday by the government will ultimately add to the cost of digital services and goods sold by foreign companies. THE CANADIAN PRESS/AP-Jenny Kane
‘Netflix tax’ for digital media likely to raise prices for consumers, experts say

The government says Canadian companies already collect those taxes when they make digital sales

Most Read