Skip to content

Eastbound Hwy 1 between Chilliwack and Hope reopened

Highway 1 between Agassiz and Hope is open again.
30366715_web1_220910-HSL-wildfire-wildfire-1_1
(Walter Scherle/Facebook)

Highway 1 between Agassiz and Hope is open again.

Up to this point, travelers along highways 7 and 9 have reported significant traffic increases due to the localized highway closure.

Emil Anderson Maintainance tweeted that Highway 1 is open once again to eastbound traffic between Exit 135 (Route 9 – Agassiz/Harrison Hot Springs) and Flood-Hope Road (exit 165).

Drive B.C. reports speeds are reduced to 80 kmh and single-lane traffic between Hunter Creek (exit 160) and Flood-Hope Road. Delays should be expected.

As the Flood Falls Trail fire near Hope remains active, the highway could re-close at any time.

Stay connected for the latest.

RELATED: Highway 1 eastbound closed as Flood Falls Trail wildfire grows to 458 hectares


@adamEditor18
adam.louis@ ahobserver.com

Like us on Facebook and follow us on Twitter.



About the Author: Adam Louis

Read more