The Pattullo Bridge connects Surrey to New Westminster. (File photo)

Earthquake warning system being installed for Pattullo Bridge

The ‘gate’ system is set to go live later this year

A new warning system for the Pattullo Bridge to alert drivers ahead of an earthquake is expected to go live later this year.

The “advanced warning system” will monitor wind speeds and also detect earthquakes to “provide alerts up to one minute prior to damaging ground waves reaching the bridge,” according to a report considered at a Sept. 25 meeting of the Mayor’s Council on Regional Transportation.

In an emailed statement, TransLink told the Now-Leader that the system will involve the installation of ground sensors that detect seismic activity.

“Once the system is activated, gates, similar to railway gates, come down to prevent traffic from crossing the bridge. In addition to the gates, the system also consists of advance warning flashers and signage for vehicles, cyclists, and pedestrians,” the statement explained.

The current crossing is more than 80 years old and was not designed to meet current wind and seismic loading standards that would apply to a new bridge constructed today, the report notes.

“As result, may be vulnerable in a seismic or hurricane-level wind event,” the Mayors Council report states. “To improve safety for Bridge users, an advance warning and monitoring system is being designed and implemented.”

PBX Engineering has completed the design work, and the contractor Mainroad has started construction.

TransLink expects the system to go live in December.

The system is not installed on any other bridges owned and maintained by TransLink, which are the Knight Street, Golden Ears, and Westham Island bridges.

READ ALSO: New Pattullo Bridge expected to open in 2023, Feb. 16, 2018

READ MORE: Pattullo Bridge project budget unchanged as bids come in Aug. 27, 2019)

With plans for a Pattullo Bridge replacement underway, TransLink is continuing to monitor the condition of the current crossing.

This year, TransLink also plans to do more repairs to some of the bridge’s railings, with some of that work already completed earlier in 2019.

“A total of 606 railing posts were inspected and assigned deficiency ratings based on their observed conditions. Of the 606 posts inspected, 128 posts were classified as needing immediate repair or replacement,” according to the TransLink report.

A condition inspection was also completed in late July.

“No new areas of concern have been reported so far as a result of the July 2019 inspections,” the report notes. “TransLink will continue to perform annual monitoring as well as any additional investigations and repairs as required if any areas of concern or accelerated deteriorations are detected.”

The condition of the bridge’s concrete deck is also being monitored, as it is in an “active and advanced state of deterioration, primarily due to corrosion of the reinforcing steel.”

TransLink says to ensure the deck remains “functional and safe,” deck experts are conducting bi-weekly walk-through inspections from the deck, ground and catwalk levels.

READ ALSO: Province selects three bidding teams for Pattullo Bridge replacement, Feb. 14, 2019

READ ALSO: Province gives OK for environmental assessment certificate for Pattullo replacement, May 2, 2019

In addition to the top surface of the deck, TransLink reports that “extensive corrosion-related damage is also occurring to the bottom surface (soffit).”

Debris netting is currently in place to protect the public and other infrastructure, including the railway tracks, from concrete falling from the deck soffit.

Northwest Hydraulic Consultants also conducts bi-annual surveys assessing risks from the changing of river hydraulics.

In its most recent survey, NHC recommended more frequent protection surveys, due to upcoming in-river works required in building the replacement crossing.

Meantime, the $1.3 billion replacement of the bridge linking Surrey and New Westminster is scheduled to start by the end of 2019 and be completed in 2023. Built north of the existing 80-year-old structure, the new bridge will still have four vehicle lanes, plus pedestrian and bike lanes and a new off-ramp to Highway 17, the South Fraser Perimeter Road.

-With files from Tom Fletcher



amy.reid@surreynowleader.com

Like us on Facebook and follow Amy on Twitter

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

UPDATE: Undercover video shows alleged animal abuse at Abbotsford egg farm

One employee wearing logo of Chilliwack chicken-catching company already facing abuse charges

Speed carving event on Friday and Saturday in Memorial Park

Organizers are keeping event small, physically distanced and stocked with sanitizer

Mission man who nearly died from COVID-19 at Abbotsford hospital reflects on one-month battle

Robert Billyard was in an induced coma to ensure his body would not fight the ventilator to breathe

Lavender hand sanitizer sale raises cash for Fraser Valley Health Care Foundation

Golf course and lavender farm partner up to support health care in the Fraser Valley

Hope resident wants swift action on ‘dangerous’ intersection after accident

The intersection at Old Hope Princeton Way and 6 Avenue is under provincial jurisdiction

‘Don’t kill my mom’: Ryan Reynolds calls on young British Columbians to be COVID-smart

‘Deadpool’ celebrity responds to premier’s call for social influence support

PHOTOS/VIDEO: Wings and Wheels set for weekend lift-off in Abbotsford

Fundraiser to raise money for Crystal Gala Foundation and the fight against breast cancer

Widow of slain Red Deer doctor thanks community for support ahead of vigil

Fellow doctors, members of the public will gather for a physically-distanced vigil in central Alberta

Protesters showcase massive old yellow cedar as Port Renfrew area forest blockade continues

9.5-foot-wide yellow cedar measured by Ancient Forest Alliance campaigners in Fairy Creek watershed

Taking dog feces and a jackhammer to neighbourhood dispute costs B.C. man $16,000

‘Pellegrin’s actions were motivated by malice …a vindictive, pointless, dangerous and unlawful act’

Racist stickers at Keremeos pub leaves group uneasy and angry

The ‘OK’ hand gesture is a known hate-symbol

VIDEO: World responds to B.C. girl after pandemic cancels birthday party

Dozens of cards and numerous packages were delivered to six-year-old Charlie Manning

Expected fall peak of COVID-19 in Canada could overwhelm health systems: Tam

National modelling projections released Friday show an expected peak in cases this fall

Most Read